Tuesday, March 6, 2012

Tile? Smile!

We made a quick stop at the house on Saturday on our way to visit friends of ours up in Frisco.  The girls stayed in the car watching Madagascar which gave us a chance to walk through the house and see some of the progress.  We also brought Bailey into the house for the first time to let him have a look around.

The main area of progress has been interior trim and tile.   This first picture shows the girls' bathroom with the tile mostly installed (not yet grouted) in the wall.  Natalie & Isabel are especially excited about the "sparkly" tile that we used for the accents.


This next picture shows the interior window trim in the office.


This next picture shows the floor tile in the guest master bathroom.


This is the shower floor in that same bathroom.


I realized that we haven't posted a picture in a while of the exterior of the house so I made a point to take this picture and post it.  You can see that the team has made a lot of progress on the siding.  Just about the entire house is completely covered in siding with the exception of a few areas on the front (you can see here between the two gables).  Also missing is the metal that will be down below and on the bumpout.  That won't be installed until it gets a little warmer, probably in April.


This detail picture shows you what the completed exterior finish looks like including the timbers, the tongue & groove cedar under the roof and the facia boards capping the roof ends.


No comments:

Post a Comment