First, the roof is shingled! This is a pretty big step since it required all the facia boards to be installed on the exterior and the drip edge. It looks to me like the shingles are maybe 75% done so my guess is they'll be complete this week.
This first picture below shows the shingles on the main roof and on the connector roof. It also shows the detail of the drip edge on the garage roof (near where the ladder is leaning).
There has also been significant progress on the tile work. This first picture shows the master bathroom shower. The large tile has been set and Al is going to work on the accent tile today and tomorrow.
The pony wall has also been built out. This is where the bench will be. Al says that the countertop company will measure for the bench this week since we're getting it from them.
Upstairs, the guest master bath is nearly complete. The tile is installed & grouted and it really came out great. There is paper over the floor so I didn't get a picture of that.
In the guest suite, Greg installed a couple of the doors and trimmed them out. After the bathroom is complete, all this room will need is paint, stain & carpet to be wrapped up.
It is a beautiful day up there, sunny & warm. Mark and Shane took advantage of the great weather and were working on getting the deck framed. They had the exterior framing / posts completed and were working on the joists. They were probably going to get the framing mostly completed next week and start installing the Trex.