After my midweek visit, we had pretty low expectations for our trip up to Breckenridge on Saturday on Memorial Day Weekend. There was actually a fair bit of work done and we're really excited to be so close to the finish line.
On the front of the house, we finally have all the cedar siding installed on the second story. This was held up waiting for the flashing to be installed between the front wall of the house and the shed roof over the front porch. Now Bob's team will come back and stain the new siding to match the rest of the siding that was already stained.
Around the back, the deck is almost complete. The railing is just about done and Mark was working on the stairs that will lead from the deck down to the concrete patio below.
In our master bath, we brought lightbulbs with us and were able to put them in and also attach the lamp shades on each of the bulbs. We hope to order the custom mirror on Tuesday and get it installed sometime in the next week or so.
Bob's guy also got the rest of the interior staining done. The catwalk and stairs now pretty much look as they will when we move into the house.