On the outside, the biggest change is in the siding on the south side of the house as well as the corbels that have been installed. The real changes are on the inside where :
- The drywall has all been hung, screw inspection is complete
- The walls have all been taped, textured and are ready for sanding & painting
- The beams have been installed across the main level and at the roof peak
This first picture shows the timber that's at the peak of the roof overlooking the foyer and great room
This next shot is taken from the end of the kitchen right about where the bar will be back into the kitchen / breakfast eating area.
There actually was some progress on the exterior siding, this picture shows the siding & cedar shakes on the back of the house around the dining room slider.
Here's another pic taken from roughly where the kitchen island will be out into the great room.
Finally, a picture in the master bedroom. This place is really starting to look like a house. Next, the drywall guys will finish the texturing, the tile guy will begin laying tile in the mudroom and the bathrooms and the doors and cabinets will be installed. Stay tuned.
No comments:
Post a Comment