We took a quick run up the hill yesterday with the whole family, minus Bailey. He's not our top choice for a guest after his last trip where he got himself lost for 6 hours and ended up wandering around Hoosier Pass covered in snow.
We were very happy to see some real progress when we drove up to the house. This picture below shows our first glimpse of some of the exterior finish work. On the front of the garage, you can see that the cedar shake shingles are installed above the garage door. In addition, the corbels are all installed (the large timbers) and they've begun installing a bit of the lap siding below the shingles on the left side (right above where I'm standing in the picture).
Looking a little closer, you can see that the tongue & groove cedar has also been installed on the underside of the roof. We think it looks really great and it's cool to see the way the outdoor lighting has been integrated. In the shot below you can also see the exterior window casing detail around the window in the attic above the garage.
On the North side of the house, you can see some significant progress on the 8" cedar lap siding. This will end up looking a lot like the garage with cedar shake shingles in the peaked part of the house and the horizontal siding below.
No comments:
Post a Comment