Although it was chilly, the sun was shining and it really was a beautiful day in the mountains. Greg has made some really good progress since before we left for our trip. The roof is on and completely dried-in (covered with ice shield, not shingles yet.)
There was between 12 - 18 inches of snow on the ground where the driveway hadn't been plowed. The big changes on the front of the house for this visit are that you can see the beginning of the shed roof that will cover the porch taking shape over the bump-out breakfast area. Also, the timbers that will support the gable roof over the front door are installed and supported by temporary framing lumber.
Stepping inside, Greg and Linda (our kitchen designer) have laid out the cabinet design onto the floor so we can really see the size & flow of the kitchen.
The interior framing is all pretty much done now. this is showing the wall between the entry hall and the office / 2nd guest room which is above the kitchen. The left side of the picture is where the catwalk will connect the two halves of the 2nd floor together across the great room.
The stairs are going to be built next week but for now I was able to use a ladder to climb upstairs to where the bunk room is going to be. Here's a picture of Greg standing next to the West window inside the bunk room. It's a big opening, it'll be filled with twin casement windows.
Downstairs, standing in our master closet (beneath the bunk room) I took this picture through the master bath and into the master bedroom. The section of concrete that is lower than the slab is going to be our master shower.