The picture below shows a picture of the foundation slab taken from a spot inside the back half of the garage. Natalie is running through the middle of the garage and Isabel is standing roughly where the guest bathroom will be downstairs.
In the last site visit, I had worked with Greg to lay out the perimeter of the back patio where the hot tub and fire pit will sit. In the picture below you can see that the concrete has been poured based on the layout that we did last week. The steps to the deck will come down roughly at the edge of the patio. The hot tub will sit on the square section which extends furthest into the backyard. The fire pit will be in the middle of the half circle with chairs around it.
This last picture shows the girls all standing where the door between the garage and the mudroom will be. We are enjoying a beautiful Indian Summer in Colorado. Today (September 25th) it was nearly 87 degrees in Denver and up the home site it was sunny and in the high 60s.